Clear Petroleum strengthens itself as the major service provider in San Jorge Gulf Basin
Comodoro Rivadavia, September 5, 2024 Clear Petroleum, in its permanent process of growth and reinforcement in the energy industry, has taken a new step forward on the strengthening of its operations in San Jorge Gulf Basin, confirming its leadership as the major service provider in the area. Through the assignment of crucial contracts, Clear has expanded Slick Line and Wire Line services, contributing not only to the company growth, but also to employment development and local production.
Clear has added two new Slick Line pieces of equipment – essential service for well intervention through the use of plain steel wire – key in the production stage. This equipment – acquired through PECOM arrangement – has already started to operate in Los Perales (under a new contract) assuring permanent accurate service.
Besides that, the integration of 8 new cooperators on this project strengthens Clear compromise with employment possibilities in the area. Slick Line service is not only vital for oil production but it also prompts the possibility of meeting market needs with greater flexibility.
‘We are proud to be present at San Jorge Golf Basin with this new equipment, which not only increases our operating capacity but also contributes significantly to local development. Our goal is to continue innovating and broadening our services to the utmost level of excellence,’ stated the operations director of the company.
As to Weatherford arrangement, Clear has added four pieces of Wire Line equipment (with pulling boom), which will be used in injection wells for flow registration done through electronic measuring and the movement of control valves at the bottom. This equipment also plays a major role in secondary recovery operations – contributing to production efficiency and sustainability.
During this first part of the assignment, 18 employees have been hired to work on these units in Las Heras – whose company numbers are 2021, 2022, 2023 and 2024. Equipment identified as 2021and 2022 has already started to operate in YPF. These two equipment units, where 11 employees from the group of people recently hired are working, confirm a sturdy and efficient operation in the area.
‘With the addition of these new Wire Line pieces of equipment, Clear establishes itself as the main actor in the production optimization process in San Jorge Gulf Basin. Not only are we committed to the company growth, but also to sustainability and department efficiency – which are essential for the future of the industry,’ highlighted another company executive.
This service implementation has been achieved through a contract signed together with SPGPCH (Chubut Private Gas and the Oil Union.) This joint effort has paved the way for Clear´s operative growth and the creation of quality employment in San Jorge Gulf Basin.
With these services under proper function, Clear strengthens its role in the basin and confirms its commitment to sustainable growth in the area. Investment in new equipment and human resources optimize the operative capacity of the company and, at the same time, trigger productivity and competition in the region, supporting economic and social development.
Clear continues standing as a main actor in the energy area, committed to innovation, efficiency and the creation of value for its clients and the whole community.
Leave a Reply
Want to join the discussion?Feel free to contribute!